← All servers
Offline

MS Project | SOLO/DUO

80.221.91.195:28015checked 5d ago

moddedcarbon
Join the server

OVR is 100 less its top share among ranked servers: top 69%.

Players now0/25
0% full
7-day average0peak –
Rank#16,036▼ 5715 places this week
Last wipe12d 10hno schedule published
Next wipe–too few wipes seen yet

Power level

Players on it, from the Steam server list.

No hourly history yet.

Hourly average and peak, UTC.

Tale of the tape

Against its closest rival: the most similar server we track.

0Players now273
07-day average326
25Slots350
8Group limit70
vanillaGather ratevanilla
–Wipesmonthly
–RegionEU

Wipe receipt

Boongarust
MS Project | SOLO/DUO
80.221.91.195:28015
WIPEDPEAK
26.09 09:071
17.09 20:031
WIPES SEEN2
AVG CYCLE8.5 DAYS
SCHEDULENONE
* players on it just before the wipe
THANK YOU · COME AGAIN NEXT WIPE

The map

Map of MS Project | SOLO/DUO
Procedural Map · 3500 · seed 789936933

Open on RustMaps

Under the hood

Asked of the server directly. Low fps and a climbing entity count mean lag.

This server has not answered a direct query in the last 48 hours.

The ranking

Down 5715 places on last week. Top 69% of all ranked servers. Daily; 1 is best.

RankRank in region
15k10k15k20k20 Sep24 Sep27 Sep1 Oct4 Oct8 Oct

In its own words

DUO PvP | No Base Raiding | Raidable Bases Max team size: 2 players Player bases cannot be raided Raid custom Raidable Bases only Keep a 6-slot backpack after death Fair PvP without offline raiding Build. Explore. Fight. Your home is always safe.

Spec sheet

Address
80.221.91.195:28015
Region
–
Max players
25
Group limit
8, the default
Wipe schedule
–
Last wipe
26 Sep 2026, 09:07 UTC
Hostname
–
First seen
13 Sep 2026

Other contenders

The same kind of game, then region, group limit, rate and wipes.

Quick answers

From the figures on this page.

Map and rules

What are MS Project | SOLO/DUO's rules and configuration?

No gather rate appears in the name of MS Project | SOLO/DUO. It uses the default group size of 8 players. It plays as survival, gather, build and raid in the standard game. Fighting and raiding between players is allowed. Modded in the browser is where it appears: plugins or settings change how the game plays. Plugins running: Carbon. VAC, Valve's anti-cheat, is enabled.

What's the map on MS Project | SOLO/DUO?

A procedural map of 3,500 with seed 789936933 is in use on MS Project | SOLO/DUO, made by the game. View it on RustMaps from this page: identical size and seed give an identical map.

Tags

What are the tags on MS Project | SOLO/DUO for?

These tags come from MS Project | SOLO/DUO and go straight into the game's server browser: gmrust (Game mode): Survival as Rust normally plays; mp25 (Max players): Slot count: 25; ts8 (Group limit): The game default: 8 to a team; v2633 (Protocol): Your game version must equal protocol 2633 to get in; cs162929 (Build): Build 162929; ptrak (Networking): The network layer is RakNet, which the game uses as standard; $r? (Region code): Region code left blank; ^z (Modded): Modded listing, with plugins or settings altering the game; ^y (Carbon): Carbon handles the plugins here. From the tags, this page also pulls its live player count, its queue and its world's creation time, and puts them at the top.

Where does MS Project | SOLO/DUO appear in Boongarust lists?

On these Boongarust lists you will find MS Project | SOLO/DUO: Top modded Rust servers. It appears on the server list when you filter by: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more; Last wipe: In the last 2 weeks.

Server info

What's the physical location of MS Project | SOLO/DUO?

From MS Project | SOLO/DUO, there is no region. What you see on Boongarust is where a server says it is, not where the machine is found to stand. Connect at 80.221.91.195:28015.

How reliable is MS Project | SOLO/DUO?

Last seen 5 days 22 hours ago, MS Project | SOLO/DUO is offline at the moment. Last 7 full days: 20% uptime, with 34 hours up out of 168. 13 September 2026 is when Boongarust first spotted it.

Which Rust build does MS Project | SOLO/DUO have?

On Linux, MS Project | SOLO/DUO runs Rust network protocol 2633 and build 162929. You must match the protocol to join; Steam updates it automatically.

Wipe times

What happens on wipe day at MS Project | SOLO/DUO?

Recent wipes peaked at 1 players on average. Peak crowd on the latest wipe came 0 hours after it. In 0% of recent wipes, half the peak was the floor until the next wipe. Where it failed to hold, the crowd sank below half by day 1.

When does MS Project | SOLO/DUO wipe?

With so few of MS Project | SOLO/DUO's wipes on record, its rhythm is unclear. The monthly force wipe hits every Rust server, and the next one lands on Thursday 5 November at 19:00 UTC. Its world is 12 days 10 hours old.

Player counts

Where does MS Project | SOLO/DUO sit in the rankings?

Player hours over seven days put MS Project | SOLO/DUO at #16,036, in the top 69% of all ranked servers.

How many players are on MS Project | SOLO/DUO?

Down right now: MS Project | SOLO/DUO, last spotted 5 days 22 hours back. Averaged 0 players across the last week.

How to join

How can you get into MS Project | SOLO/DUO?

Press F1 in Rust to open the console and enter client.connect 80.221.91.195:28015. Or click Launch Rust here, which uses Steam to open the game and join.

Sticker sheet

Every tag it publishes, and what it means. Published as mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y.

gmrustGameGame mode Survival as Rust normally plays.
mp25GameMax players Slot count: 25.
ts8GameGroup limit The game default: 8 to a team.
v2633GameProtocol Your game version must equal protocol 2633 to get in.
cs162929GameBuild Build 162929.
ptrakGameNetworking The network layer is RakNet, which the game uses as standard.
$r?GameRegion code Region code left blank.
^zMods and accessModded Modded listing, with plugins or settings altering the game.
^yMods and accessCarbon Carbon handles the plugins here.

Flag meanings are Facepunch's.